Study of Prevention and Control Technology for Roadway Excavation under the Soft and Extra-Thick Coal Roof in Luling Coal Mine

Author:

Huang ShunjieORCID,Zhao Guangming,Meng Xiangrui,Cheng Xiang,Xu Wensong,Liu Gang,Zhu Shikui

Abstract

In view of the problems associated with the poor stability of coal walls, coal slide and leakage of top-coal at the tunnel excavation working face under a soft and extra-thick coal roof, the surrounding rock at the tunnel excavation working face must be strengthened. The theoretical analysis of rock pressure, numerical simulation and other methods were comprehensively used to study the coal-wall-slicing mechanism. Given the characteristics of a soft and extra-thick coal roof, the combined supporting technology of “coal wall water injection + metal roof frame” is proposed. The findings show that in the process of roadway excavation, the coal–rock junctions of the wall and the middle part of the roof are weak areas that are prone to spalling and therefore need to be strengthened. Laboratory tests determined the moisture content of the coal body during tunneling to provide data for the parameter design of coal wall water injection. Safe and efficient excavation of the roadway was ensured by injecting water into the coal wall in combination with a metal roof protection skeleton. The application of this technology not only effectively prevents rib spalling but improves control of the deformation of the surrounding rock. During 40 days of field observation, the maximum deformation of the roof was 24.8 mm, and the distance between the two roadway walls was 21.5 mm. The deformation of the roadway was controlled within a safety zone. The application of this technology reduced the repair rate of the roadway and improved the efficiency of the roadway excavation. It brought significant economic benefits and provides an important reference for similar mines.

Publisher

MDPI AG

Subject

Process Chemistry and Technology,Chemical Engineering (miscellaneous),Bioengineering

Reference26 articles.

1. Research on Control of Rib Spalling Disaster in the Three-Soft Coal Seam

2. Study on rib spalling control of shortwall drilling mining technology with a large mining height

3. Sloughing mechanism and control of coal wall in high cutting fully-mechanized top coal caving mining face in ultra-thick seam;Li;Coal Sci. Technol.,2016

4. Prevention Measures for Rib Spalling at Large Mining Height Working Face;Jin;Saf. Coal Mines,2013

5. Analysis of geomechanical changes in hanging wall caused by longwall multi top caving in coal mining

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3