Expediting Time to Market: Evaluating the Effects of Change Control Board Performance in Emerging Markets

Author:

Irfan Sanaullah1,Ali Jamshid2,Hidayat-ur-Rehman Imdadullah2ORCID,Khwaja Muddasar Ghani3ORCID,Rosak-Szyrocka Joanna4ORCID,Kovacs Attila5

Affiliation:

1. Bahria Business School, Bahria University, Islamabad 44000, Pakistan

2. Faculty of Business Administration, University of Tabuk, Tabuk 71491, Saudi Arabia

3. Department of Business, School of Justice, Security and Sustainability, Staffordshire University, Stoke-on-Trent ST4 2DF, UK

4. Department of Production Engineering and Safety, Faculty of Management, Częstochowa University of Technology, 42-200 Częstochowa, Poland

5. Faculty of Business, Communication and Tourism, Budapest Metropolitan University, 1148 Budapest, Hungary

Abstract

This study aims to assess how the performance of Change Control Boards (CCBs) influences the relationship between requirements uncertainty and the Time to Market (TTM) of software projects in emerging markets. We collected data through a structured questionnaire, conducting surveys in project-based IT organizations across various cities in Pakistan. This research adopts a quantitative approach, employing software project houses as the unit of analysis. We selected 38 software projects out of 50 using a multi-stage sampling method and analyzed the data using Smart PLS 4.0 and SPSS 23. The results reveal that requirements uncertainty has a significant impact on Time to Market (TTM) conditions. Our study concludes that the presence and effective performance of CCBs can substantially reduce TTM. Additionally, higher CCB performance can expedite TTM, particularly when requirements lack precision initially. The study underscores the profound influence of requirements uncertainty on TTM in software projects. It provides organizations with insights into the critical role of CCBs, the consequences of uncontrolled changes in the absence or ineffectiveness of CCBs, and how requirements uncertainty affects software project development and timelines. This research contributes to software management and product development processes by highlighting the importance of requirement engineering during the planning phase to address uncertainty issues and enhance CCB performance.

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3