Research on Parameter Optimization of the Optimal Schedule Model of Water Resources for the Jiaodong Water Transfer Project Based on the ICCP Model

Author:

Zhao Ranhang1,Gan Tian12,Wang Xingju1,Wang Haofang1

Affiliation:

1. School of Civil Engineering, Shandong University, Jinan 250100, China

2. State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing 100038, China

Abstract

Establishing an optimal operation model of water resources is a crucial mean to promote the social and economic development in the Jiaodong area, where water resources are seriously deficient. Constraints of the optimal operation model mainly include water balance constraint, discharge capacity constraint, and constraint on the full utilization of operating water. For water transfer projects that have been in operation for decades, the parameters of these constraints, such as Discharge Capacity (DC), Water Conveyance Efficiency (WCE), Evapotranspiration (E), and Water Supply Volume (WSV), have changed from their original design values, which in turn affect the results of the operation model. In order to address the uncertainties caused by corresponding parameters, according to the characteristics of each parameter, an Interval-Chance Constrained Programming (ICCP) model for the Jiaodong Water Transfer Project was proposed. Interval Programming (IP) and Chance-Constrained Programming (CCP) were used to optimize the parameters of constraints involving WCE, DC, E, and WSV. Then, the Sobol method was used to analyze the sensitivity of each parameter to the operating objective function. The results reveal that (1) total water shortage ratio decreased by [14.82%, 17.26%], [14.81%, 17.25%], and [14.82%, 17.26%], respectively, under the incoming water condition of 50%, 75%, and 95%, indicating that ICCP model can adequately consider complex uncertainties and effectively alleviate water shortage; (2) WCE and DC are important parameters for optimal operation model of water resources, and therefore, channels should be regularly maintained to ensure that WCE and DC would not reduce; (3) Decision variables in this study are in the form of intervals, which are more reasonable because they provide more decision-making options to managers.

Funder

water conservancy research and technology promotion projects in Shandong Province of China

National 12th Five Year Plan water project of China

Publisher

MDPI AG

Subject

Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry

Reference31 articles.

1. Research on Water Resources Optimal schedule of Jiaodong Water Diversion Project;Yang;Yellow River,2018

2. Sun, J.H. (2020). Research on Water Transfer Efficiency and Optimal Scheduling of Water Resources in Jiaodong Water Transfer Project. [Master’s Thesis, Shandong University].

3. Development of an optimization model for water resources systems planning;Miao;Eng. Appl. Artif. Intell.,2013

4. Ten iterative steps in development and evaluation of environmental models;Jakeman;Environ. Model. Softw.,2006

5. A multistage fuzzy-stochastic programming model for supporting sustainable water-resources allocation and management;Li;Environ. Model. Softw.,2009

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3