Affiliation:
1. School of Civil Engineering, Shandong University, Jinan 250100, China
2. State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing 100038, China
Abstract
Establishing an optimal operation model of water resources is a crucial mean to promote the social and economic development in the Jiaodong area, where water resources are seriously deficient. Constraints of the optimal operation model mainly include water balance constraint, discharge capacity constraint, and constraint on the full utilization of operating water. For water transfer projects that have been in operation for decades, the parameters of these constraints, such as Discharge Capacity (DC), Water Conveyance Efficiency (WCE), Evapotranspiration (E), and Water Supply Volume (WSV), have changed from their original design values, which in turn affect the results of the operation model. In order to address the uncertainties caused by corresponding parameters, according to the characteristics of each parameter, an Interval-Chance Constrained Programming (ICCP) model for the Jiaodong Water Transfer Project was proposed. Interval Programming (IP) and Chance-Constrained Programming (CCP) were used to optimize the parameters of constraints involving WCE, DC, E, and WSV. Then, the Sobol method was used to analyze the sensitivity of each parameter to the operating objective function. The results reveal that (1) total water shortage ratio decreased by [14.82%, 17.26%], [14.81%, 17.25%], and [14.82%, 17.26%], respectively, under the incoming water condition of 50%, 75%, and 95%, indicating that ICCP model can adequately consider complex uncertainties and effectively alleviate water shortage; (2) WCE and DC are important parameters for optimal operation model of water resources, and therefore, channels should be regularly maintained to ensure that WCE and DC would not reduce; (3) Decision variables in this study are in the form of intervals, which are more reasonable because they provide more decision-making options to managers.
Funder
water conservancy research and technology promotion projects in Shandong Province of China
National 12th Five Year Plan water project of China
Subject
Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry
Reference31 articles.
1. Research on Water Resources Optimal schedule of Jiaodong Water Diversion Project;Yang;Yellow River,2018
2. Sun, J.H. (2020). Research on Water Transfer Efficiency and Optimal Scheduling of Water Resources in Jiaodong Water Transfer Project. [Master’s Thesis, Shandong University].
3. Development of an optimization model for water resources systems planning;Miao;Eng. Appl. Artif. Intell.,2013
4. Ten iterative steps in development and evaluation of environmental models;Jakeman;Environ. Model. Softw.,2006
5. A multistage fuzzy-stochastic programming model for supporting sustainable water-resources allocation and management;Li;Environ. Model. Softw.,2009