Abstract
A powered longwall mining system comprises three basic machines: a shearer, a scraper (longwall) conveyor, and a powered roof support. The powered roof support as a component of a longwall complex has two functions. It protects the working from roof rocks that fall to the area where the machines and people work and transports the machines and devices in the longwall as the mining operation proceeds further into the seam by means of hydraulic actuators that are adequately connected to the powered support. The actuators are controlled by a hydraulic or electro-hydraulic system. The tests and analyses presented in the developed procedure are oriented towards the possibility of introducing automatic control, without the participation of an operator. This is important for the exploitation of seams that are deposited at great depths. The primary objective was to develop a comprehensive methodology for testing and evaluating the possibility of using the system under operating conditions. The conclusions based on the analysis presented are a valuable source of information for the designers in terms of increasing the efficiency of the operation of the system and improving occupational safety. The authors have proposed a procedure for testing and evaluation to introduce an automatic control system into the operating conditions. The procedure combines four areas. Tests and analyses were carried out in order to determine the extent to which the system could be potentially used in the future. The presented solution includes certification and executive documentation.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Reference77 articles.
1. MineLoc — Personnel Tracking System for Longwall Coal Mining Sites
2. Identification of Shearer Cutting Patterns Using Vibration Signals Based on a Least Squares Support Vector Machine with an Improved Fruit Fly Optimization Algorithm
3. A novel approach for coal seam terrain prediction through information fusion of improved D–S evidence theory and neural network
4. Zastosowanie nowoczesnych rozwiązań do zasilania sekcji obudowy zmechanizowanych w kompleksie ścianowym w kopalni,,Ziemowit”, ze szczególnym uwzględnieniem sterowań elektrohydraulicznych i wizualizacji parametrów pracy urządzeń;Janik;Nap. Sterow.,2011
5. Sterowanie elektrohydrauliczne DOH-matic do automatyzacji pracy obudowy zmechanizowanej;Kasprusz;Wiadomości Górnicze,2013
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献