BIM-Based Co-Simulation of Fire and Occupants’ Behavior for Safe Construction Rehabilitation Planning

Author:

Shams Abadi Seyedeh Tannaz,Moniri Tokmehdash Nojan,Hosny AbdelhadyORCID,Nik-Bakht Mazdak

Abstract

Construction renovation projects increase the risk of structural fire, mostly due to the accumulation of combustible construction materials and waste. In particular, when the building remains operational during such projects, the redistribution of occupants and interruptions with access corridors/exit egress can exponentially increase the risk for the occupants. Most construction projects are, however, planned and scheduled merely based on the time and budget criteria. While safety is considered paramount and is meant to be applied as a hard constraint in the scheduling stage, in practice, safe evacuation considerations are reduced to rules of thumb and general code guidelines. In this paper, we propose simulation as a tool to introduce safety under structural fire, as a decision criterion, to be mixed with time and budget for selecting the best construction schedule alternative. We have used the BIM (building information model) to extract the building’s spatial and physical properties; and have applied co-simulation of fire, through computational fluid dynamics (CFD), and occupants’ evacuation behavior, through agent-based modeling (ABM) to estimate the average and maximum required safe egress time for various construction sequencing alternatives. This parameter is then used as a third decision criterion, combined with the project’s cost and duration, to evaluate construction schedule alternatives. We applied our method to a three-floor fire zone in a high-rise educational building in Montreal, and our results show that considering the fire safety criterion can make a difference in the final construction schedule. Our proposed method suggests an additional metric for evaluating renovation projects’ construction plans, particularly in congested buildings which need to remain fully or partially operational during the renovation. Thus, this method can be employed by safety officers and facility managers, as well as construction project planners to guide accounting for fire incidents while planning for these types of projects.

Publisher

MDPI AG

Subject

Earth and Planetary Sciences (miscellaneous),Safety Research,Environmental Science (miscellaneous),Safety, Risk, Reliability and Quality,Building and Construction,Forestry

Reference49 articles.

1. Fires in Structures under Construction or Renovation;Campbell,2020

2. Renovation and Construction “Are you Ensuring the Safety of Occupants and Contractors?”;Leber,2014

3. An evacuation model validation data-set for high-rise construction sites

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3