Abstract
Distribution system state estimation (DSSE) is a valuable step for DSOs toward tackling the challenges of transitioning to a more sustainable energy system and the evolution and proliferation of electric cars and power electronic devices. However, on the LV level, implementation has only taken place in a few pilot projects. In this paper, an LV DSSE method is presented and implemented in four real Hungarian LV supply areas, according to well-defined scenarios. Pseudo-measurement datasets are generated from AACs and SLPs, which have been used in different combinations on networks built with different accuracies in terms of load placement. The paper focuses on the critical aspects of finding accurate and coherent information on network topology with automated management of information systems, real LV network implementation for power flow calculation and managing portions of the network characterized by uncertain or inconsistent line lengths. A refining algorithm is implemented for the integrated network information system (INIS) models. The published method estimates node voltages with a relative error of less than 1% when using AACs, and a meter-placement method to reduce the maximum value of relative errors in future scenarios is also presented. It is shown that the observation of node voltages can be improved with the usage of AACs and SLPs, and with optimal meter placement.
Funder
Hungarian Academy of Sciences
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献