Improving Sustainable Project Success Strategies Focused on Cost and Schedule for Electrical Construction Project Management

Author:

Kim JanghwanORCID,Lim JeeyoungORCID,Lim Hyoung-Chul,Kim Dae Young

Abstract

Electrical contractors encounter problems such as limited construction sites, schedule interference, and inefficient communication with other contractors when they typically subcontract with general contractors. Electrical projects require effective and systematic project management strategies to overcome these problems and achieve the desired goal. In an electrical construction project, individual tasks are interconnected at different stages, including pre-construction planning (PCP) and project execution (PE). Therefore, analyzing the effect of task strings on the project success in terms of schedule and cost performance is necessary. The main objective of this study is to perform a static analysis to compare successful and failed projects with a focus on the cost and schedule performances, using the PCP and PE task strings in electrical construction projects. To achieve this, a continuous PCP-PE task strings implementation score was calculated for each PE group in terms of cost and schedule, and successful and failed projects on unweighted and weighted values were compared and analyzed by performing an independent sample t-test. Consequently, it was confirmed that the use of most task strings had a positive effect on the cost success at a confidence level of 95%, and that only the subcontractor management group had a positive effect on the schedule success. Hence, it was derived that the usage of task strings for these groups is recommended for cost success in electrical construction, and continuous PCP-PE task strings do not have a positive effect on schedule success; therefore, it is recommended to use the PCP-PE task strings only for specific groups for schedule success in electrical construction. Demonstrating the relationship between the PCP and PE tasks, the findings of this study are expected to help electrical contractors achieve a better performance using effective project management strategies.

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3