Affiliation:
1. College of Civil Engineering, Zhejiang University of Technology, Hangzhou 310014, China
2. Huadong Engineering Corporation Limited, Hangzhou 310014, China
Abstract
The air-booster vacuum preloading method has been applied to slurry ground improvement. It is based on the conventional vacuum preloading method but with an additional injection of pressurised air into the soil via pre-installed conductors. The drainage effect of air-booster vacuum preloading has been demonstrated by past studies; however, direct observations of the real-time behaviour of slurries subjected to boosted air remain lacking. This study used a combined monitoring technique that included particle image velocimetry, pore water/air pressure gauges, a vortex flowmeter and an electronic balance to conduct a laboratory test of air-booster vacuum consolidation of dredged slurry. The tests allowed analyses of (1) the real-time displacement field of the slurry, (2) the pressure–flux relationship of the pressurised air, and (3) the pore water pressure responses during air boosting. The first aspect allowed direct observation of small-crack initialisation and propagation during pressurisation; while the latter two confirmed the crack initiation based on drops in air and pore water pressures. The measured crack initiation pressure was verified by comparison with theoretical predictions. The results demonstrate that pressurised air induces cracks in soil, which promote the drainage consolidation of dredged slurry.
Funder
National Natural Science Foundation of China
Natural Science Foundation of Zhejiang Province
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献