The equipment investment is large and the annual operating cost is high in oversized open-pit mines. The rationality of the truck-shovel selection and matching has a more prominent influence on the economic benefit of mines. Therefore, we set up an optimization method of truck-shovel selection for oversized open-pit mines, and developed a software system of truck-shovel matching to solve the problem of truck-shovel selection and matching for oversized open-pit mines. First, based on the likelihood statistics method to decide the reasonable quantity range of shovels in the oversized open-pit mine, the selection and matching of shovels under different production scales are realized according to the production ability equation of shovels. Then, according to the principal of deciding the truck by shovel, and by deciding the shovel equipment, the truck-shovel efficiency model is constructed, the proper bucket-to-capacity ratio is obtained in the oversized open-pit mine, and the economic range of truck matching under different shovel specifications is determined by the bucket-to-ability ratio. Finally, using this method, the software system of truck-shovel matching is developed by using C# language, which can automatically calculate the quantity of equipment and the material consumption. The results show that the reasonable number of shovels for the oversized open-pit mine should be 4~7, and the bucket-to-capacity ratio should be 4~5:1. When the annual excavation quantity of the mine is 80~150 million tons, the 35~55 m3 shovels should be the mainstream specification. The research results were applied to a new oversized open-pit mine in Tibet, China, and the problem of equipment selection was solved.
Funder
National Natural Science Foundation of China
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Reference24 articles.
1. Truck-shovel selection and calculation of automobile transport scheme in open-pit mine design;Miao;Eng. Des. Res.,1996
2. Selection and matching of truck and excavator in open-pit mine loading operation;Wang;Non-Met. Mines,2002
3. Selection of mining and transport equipment in open-pit mine;Wang;Opencast Min. Technol.,2017
4. Analysis on selection of open pit mine transport equipment based on VPRS and VIKOR method;Yin;Coal Technol.,2016
5. The application of AHP-FUZZY in equipment selection of open-pit mine (P);Liu;Min. Res. Dev.,2017
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献