Abstract
The transverse cofferdam in Xiangjiaba hydropower station was a water retaining concrete structure with a length of 126 m, a width of 12 m, and a height of 25.2 m, consisting of masonry, plain concrete structure (PC), and roller compacted concrete (RCC), which had to be demolished by blasting after the dam was built. There were many precise instruments nearby the cofferdam which had strict restrictions on blasting vibration. Therefore, the cofferdam was divided into six blasting regions, including land blasting and underwater blasting. Blasting parameters and blasting network structure were accurately designed and continuously optimized through blast-induced vibration test results. At nine measurement points in different locations, 57 blast vibration data were recorded. Consequently, 1386 holes with an explosive weight of 9641.3 kg were detonated in land blasting. The highest levels of vibration were recorded as 8.74 cm/s in the desilting tunnel on the right of the cofferdam. The explosives up to 11887.7 kg were detonated in an underwater blasting. According to the analysis of the law of vibration attenuation, the blast vibration value was reduced to 7.65 cm/s. The results showed that the research on the attenuation law of blasting vibration can effectively increase the charge weight per delay and control the blast-induced vibration. Consequently, the peak particle velocity (PPV) of underwater blasting could be predicted by analyzing the PPV of land blasting in same structure, which provided the basis for the design of underwater blasting parameters. A reliable method for cofferdam demolition in hydropower station was proposed, which provided a reference for similar projects.
Funder
National Natural Science Foundation of China
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献