Abstract
This article describes a methodical framework that combines two specific methods of Lean management, namely the ABC method and the MRP planning method. The article further argues that combining the ABC inventory method with subsequent MRP planning is beneficial if the combination is implemented in practice. To demonstrate the benefits, the framework is tested using a case study company. The presented case-study problem is to reduce the number of changeover downtimes in the environment of an engineering production company. The researched company deals with the problem of setting up production lines in a way to minimize the number of downtimes within one work shift. Within the solution, four possible variants of the production plan are presented. By combining the ABC and MRP methods, up to four changeovers can be saved, which in financial terms represents a saving of about EUR 450,000 per year.
Funder
Scientific Grant Agency of the Ministry of Education, Science, Research, and Sport of the Slovak Republic and the Slovak Academy Sciences as part of the research project VEGA
Subject
Process Chemistry and Technology,Chemical Engineering (miscellaneous),Bioengineering
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献