Experimental Study on Pile Load Transfer Considering Rice Stone Filled-In Gaps between Steel Drive Pipe and Pile Casing in Karst Region

Author:

Zhu Fangcai12ORCID,Yang Zhijia12,Liu Qing1,Zhao Yanlin3ORCID,Wu Binbin4,Zhang Shaolong4,Chen Qi4,Chen Yifan12,Luo Rui3

Affiliation:

1. School of Civil Engineering, Hunan University of Technology, Zhuzhou 412007, China

2. Intelligent Control of Safety and Risk for Existing Engineering Structures, Key Laboratory of Hunan Province, Zhuzhou 412007, China

3. School of Resources & Environmental and Safety Engineering, Hunan University of Science and Technology, Xiangtan 411201, China

4. China Railway Beijing Engineering Bureau Group Second Engineering Co., Ltd., Changsha 410116, China

Abstract

For a guarantee of perpendicularity and stiffness in piles in Karst areas, full rotary cast-in-place piles are often utilized, steel pipes are rotarily driven into a stratum, and inner-steel pile casing is positioned. With the engineering background of the bridge piles of Guinan high-speed railway in Guangxi autonomous region, the space between steel drive pipe is filled with rice stones, the load-transfer mechanism of which was studied. An apparatus was designed for pullout of the drive pipe, rice stones are replaced with coarse stones, a simplified organic glass-pipe model is put forward, another similar indoor stratigraphic model is also pre-cast, and the movement of coarse sands and load transfer is studied with two models. The quantity of sands is calculated using back analysis through reappearance and the Rhino model: the first one is estimated using a reproduction of the pullout procedure, the second is calculated through the Rhino model based on the observation of the shape of sand in caves. When the drive pipe is pulled out, some coarse sand flows into the Karst caves and becomes loose, while load is applied on the top of the pile. The movement of coarse sand develops further, and more coarse sand flows into caves close to the bottom; this leads to a reduction its frictional resistance, and the axial force of the pile increases closer to the upper position of the cave, whereas the axial force of the pile is concentrated almost constantly close to the bottom of the cave. Comparing the end resistance and the frictional resistance, coarse sand can bear pile load to a great extent.

Funder

Zhuzhou joint project of Hunan Provincial Natural Science Foundation

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Reference40 articles.

1. Research and application status of complete set of pipe cast-in-place pile in China;Liu;Guangdong Archit. Civ. Eng.,2021

2. Construction of full-set rotary bored pile in Karst Geology;Liu;House,2021

3. Full-Rotation rapid construction technology of bored piles in Complex Karst;Liu;Technol. Innov. Appl.,2019

4. Design of a novel drilled-and-grouted pile in sand for offshore oil&gas structures;Igoe;Mar. Struct.,2014

5. Influence of Benoto bored pile construction on nearby existing tunnel: A case study;Gao;Soils Found.,2019

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3