Author:
Nawalany Grzegorz,Sokołowski Paweł
Abstract
This paper deals with the problem of rational energy management in an intermittently heated broiler house. The aim was to evaluate the energy amount necessary to heat up the building floor for the production cycle, preceded by a technological interruption of varying length. The scope of studies included the indoor and outdoor air temperature measurements and the soil temperature measurements under the building floor. The results of field tests allowed computer simulations to be carried out in the WUFIplussoftware (Fraunhofer Institute for Building Physics, Holzkirchen Branch, Germany). The variant analysis was preceded by the validation of the calculation model whose results showed a strong correlation of theoretical data with actual results. The winter breeding cycle was analyzed in detail. The detailed soil and air temperature curves are presented graphically. The results allow a conclusion that the length of the technological interruption has a significant impact on the amount of energy in the first days of the broiler breeding. The extension of the technological interruption by seven days increases the amount of heating energy in the first day of the cycle by 24%. The extension of the technological interruption causes also the need for a longer floor heating in the first day of the cycle.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献