Abstract
This paper addresses the coordinative operation problem of multi-energy virtual power plant (ME-VPP) in the context of energy internet. A bi-objective dispatch model is established to optimize the performance of ME-VPP in terms of economic cost (EC) and power quality (PQ). Various realistic factors are considered, which include environmental governance, transmission ratings, output limits, etc. Long short-term memory (LSTM), a deep learning method, is applied to the promotion of the accuracy of wind prediction. An improved multi-objective particle swarm optimization (MOPSO) is utilized as the solving algorithm. A practical case study is performed on Hongfeng Eco-town in Southwestern China. Simulation results of three scenarios verify the advantages of bi-objective optimization over solely saving EC and enhancing PQ. The Pareto frontier also provides a visible and flexible way for decision-making of ME-VPP operator. Two strategies, “improvisational” and “foresighted”, are compared by testing on the Institute of Electrical and Electronic Engineers (IEEE) 118-bus benchmark system. It is revealed that “foresighted” strategy, which incorporates LSTM prediction and bi-objective optimization over a 5-h receding horizon, takes 10 Pareto dominances in 24 h.
Funder
National Natural Science Foundation of China
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Reference30 articles.
1. The Virtual Power Plant, Excerpt from Standard & Poor’s Utilities & Perspectives;Patterson,1998
2. Flexible Electricity Network to Integrate Expected “Energy Solution” (FENIX)http://www.fenix-project.org/
3. Virtual power plant field experiment using 10 micro-CHP units at consumer premises
4. Electric Vehicles in Danish Power System with Large Penetration of Wind Power;Yang;Autom. Electr. Power Syst.,2011