A Model for Determining the Optimal Decommissioning Interval of Energy Equipment Based on the Whole Life Cycle Cost

Author:

Li Biao1,Wang Pengfei2,Sun Peng3,Meng Rui3ORCID,Zeng Jun1,Liu Guanghui1

Affiliation:

1. State Grid Hebei Electric Power Co., Ltd., Shijiazhuang 050022, China

2. Beijing Sgitg Accenture Information Technology Center Co., Ltd., Beijing 100000, China

3. Department of Mathematics and Science, North China Electric Power University, Beijing 102206, China

Abstract

An appropriate technical overhaul strategy is very important for the development of enterprises. Most enterprises pay attention to the design life of the equipment, that is, the point when the equipment can no longer be used as stipulated by the manufacturer. However, in the later stage of the equipment, the operation and maintenance costs may be higher than the benefit of the equipment. Therefore, only the design life of the equipment may cause a waste of funds, so as to avoid the waste of funds, the enterprise’s strategy of technical reform and overhaul are optimized. This paper studies the optimal decommissioning life of the equipment (taking into account both the safety and economic life of the equipment), and selects the data of a 35 kV voltage transformer in a powerful enterprise. The enterprise may have problems with the data due to recording errors or loose classification. In order to analyze the decommissioning life of the equipment more accurately, it is necessary to first use t-distributed stochastic neighbor embedding (t-SNE) to reduce the data dimension and judge the data distribution. Then, density-based spatial clustering of applications with noise (DBSCAND) is used to screen the outliers of the data and mark the filtered abnormal data as a vacancy value. Then, random forest is used to fill the vacancy values of the data. Then, an Elman neural network is used for random simulation, and finally, the Fisher orderly segmentation is used to obtain the optimal retirement life interval of the equipment. The overall results show that the optimal decommissioning life range of the 35 kV voltage transformer of the enterprise is 31 to 41 years. In this paper, the decommissioning life range of equipment is scientifically calculated for enterprises, which makes up for the shortage of economic life. Moreover, considering the “economy” and “safety” of equipment comprehensively will be conducive to the formulation of technical reform and overhaul strategy.

Funder

Hebei Electric Power Research Institute

North China Electric Power University

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3