Abstract
The Early Medieval Fossa Carolina is the first hydro-engineering construction that bridges the Central European Watershed. The canal was built in 792/793 AD on order of Charlemagne and should connect the drainage systems of the Rhine-Main catchment and the Danube catchment. In this study, we show for the first time, the integration of Airborne LiDAR (Light Detection and Ranging) and geoarchaeological subsurface datasets with the aim to create a 3D-model of Charlemagne’s summit canal. We used a purged Digital Terrain Model that reflects the pre-modern topography. The geometries of buried canal cross-sections are derived from three archaeological excavations and four high-resolution direct push sensing transects. By means of extensive core data, we interpolate the trench bottom and adjacent edges along the entire canal course. As a result, we are able to create a 3D-model that reflects the maximum construction depth of the Carolingian canal and calculate an excavation volume of approx. 297,000 m3. Additionally, we compute the volume of the present dam remnants by Airborne LiDAR data. Surprisingly, the volume of the dam remnants reveals only 120,000 m3 and is much smaller than the computed Carolingian excavation volume. The difference reflects the erosion and anthropogenic overprint since the 8th century AD.
Funder
Deutsche Forschungsgemeinschaft
Subject
General Earth and Planetary Sciences
Reference61 articles.
1. The Origin of the European Economy. Communications and Commerce A.D. 300–900;McCormick,2010
2. Digging Ditches in Early Medieval Europe
3. Fossa Carolina: The First Attempt to Bridge the Central European Watershed-A Review, New Findings, and Geoarchaeological Challenges
4. Fossata Magna—A Canal Contribution to Harbour Construction in the 1st Millenium AD;Werther,2018
5. Connecting Harbours: A Comparison of Traffic Networks across Ancient and Medieval Europe;Preiser-Kapeller,2018
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献