Power reserves are usually scheduled in day-ahead unit commitment (UC) to minimize operating costs while maintaining system security. In applying basic UC (bUC) after a contingency, the system frequency may fall upon the activation of the load-shedding global control (under-frequency load-shedding or UFLS) limits. Small isolated microgrids are more sensitive to this issue due to their lack of inertia. Including dynamic considerations into the bUC problem can minimize UFLS activation and also avoid the need for the operator to later check the short-term feasibility of a bUC solution. These proposals are known as Frequency-Constrained UC (FCUC), although the implementation are very time-consuming. FCUC implementation will increase the system’s operational costs, which should be calculated to estimate remuneration to the safety service based on the additional reserve provision. The electrical system of Gran Canaria island has suffered several episodes of greater blackouts in recent years. Shortly, there will be 242 MW of wind generation installed (26% of the thermal power installed on Gran Canaria). The main objective of this work is to improve the island system reliability by means of an FCUC formulation applied by the system operator in practice, including renewable sources. The results show that the frequency values remained within the admissible boundaries, but the system’s operational costs increased by around 13%.

Funder

Ministerio de Ciencia e Innovación

Villum Fonden

Publisher

MDPI AG

Subject

Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)

Reference43 articles.

1. Ministerio de Energía, Turismo y Agenda Digital, España, Resolución de 1 de febrero de 2018 de la Secretaría de Estado de Energía por la que se Aprueba el Procedimiento de Operación 12.2 “Instalaciones Conectadas a la Red de Transporte y Equipo Generador: Requisitos mínimos de Diseño, Equipamiento, Funcionamiento, Puesta en Servicio y Seguridad” de los Sistemas Eléctricos No Peninsulares https://www.boe.es/boe/dias/2018/02/16/pdfs/BOE-A-2018-2198.pdf

2. Power System Stability and Control;Kundur,1994

3. Application of Underfrequency Relays for Automatic Load Shedding

4. Wind Integration in Power Systems: Operational Challenges and Possible Solutions

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3