Abstract
Building-information-modeling for cultural heritage (HBIM), which is established using surveying data, can be used to conserve architectural heritage. The development of an HBIM model for ancient wooden architecture (AWA) structures requires interdisciplinary integration. A parametric model for the main components that intelligently integrates the historical knowledge, as well as an intelligent modeling method for these components, are two critical issues required to bridge the existing gap and improve the application of HBIM. Taking an AWA structure constructed during the Liao and Song Dynasties as an example, the parametric model for the typical components, with emphasis on commonality and characteristics, were first proposed. Subsequently, an intelligent automated modeling method was developed and programmed using Dynamo, which can intelligently identify the component type and determine the invisible dimensions. A complicated dou-gong was successfully established with surveying data using the proposed method within five minutes, thereby validating the reliability and efficiency of this method. Furthermore, the proposed method was used to establish the HBIM model of Yingxian Wood Pagoda, which is the oldest and tallest AWA structure in China with a height of 65.88 m. The research findings will provide an essential reference for the conservation of wooden architectural heritage structures.
Subject
Earth and Planetary Sciences (miscellaneous),Computers in Earth Sciences,Geography, Planning and Development
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献