Abstract
Loss of excitation (LOE) relay is one of the most essential protection elements for synchronous generators in power plants. During the last few decades, several LOE detection methods have been proposed, while limited schemes such as admittance- and impedance-based ones have been adopted for industrial applications. This study investigates and compares the behavior of some practical LOE detection schemes through extensive simulation scenarios, and from the reliability, speed, and security points of view. The simulation scenarios are accomplished by using the real-time-digital-simulator, where the phase domain model of the synchronous generator is used to develop a realistic and typical power generation system. Employing such a system, different types of complete and partial LOE incidents can be applied according to IEEE Standard C37.102-2006, while the performance of any scheme can be assessed through accurate and realistic LOE scenarios.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献