Analytical and Experimental Investigation of the Critical Length in Casing–Liner Overlap

Author:

Al Ramadan Mustafa,Salehi Saeed,Ezeakacha Chinedum,Teodoriu Catalin

Abstract

Offshore drilling operations exhibit various difficulties attributed to shallow flows worldwide. One of the most common practices for drilling offshore wells is to use liners and liner hangers rather than using full casing strings. This reduces the cost of drilling operation. Liners and liner hangers are required to pass certain standards prior to their deployment in the field. This ensures their ability to withstand harsh downhole conditions and maintain the integrity of the well. A liner hanger contains an integrated seal assembly that acts as a barrier to prevent fluid migration. The cement that is placed within the casing–liner overlap is also considered a barrier, and it is critical that it maintains the integrity of the well by mitigating fluid migration to other formations and to the surface. The failure of this dual barrier (cement and seal assembly) system to seal the annular space can result in serious problems that might jeopardize a well’s integrity. Typically, in field applications, the length of a casing–liner overlap is chosen arbitrarily. In some cases, shorter overlaps (50 to 200 ft) are chosen because of the lower cost and easy identification of leaks during pressure tests. However, some loss of well control incidents (particularly the incident that motivated this study) have been linked to fluid leakages along the casing–liner overlap. This paper investigates the critical length of the casing–liner overlap by modeling gas leakage through the cement placed within the overlap using analytical and experimental approaches. Leakage scenarios were developed to mimic gas migration within the cement in the casing–liner overlap. The results showed that the longer the casing–liner overlap, the higher the leakage time. The results also showed that the current casing pressure test duration of 30 min may not be adequate to verify the integrity of the cement within the overlap. Based on the results and analyses, it is recommended to increase the pressure test duration to 90 min. In addition, the results suggest that the length of the casing–liner overlap should not be less than 300 ft to maintain the integrity of the well in the case of gas influx. Further details are highlighted in the results section. In practice, the current rationale behind the selection of a casing–liner overlap length is not sustainable. Thus, the major advantage of this study is that with field data, it provides both scientific and research-based evidence that can be used to inform the decision behind the selection of the casing–liner overlap length, especially in gas migration-prone zones.

Funder

Bureau of Safety and Environmental Enforcement

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3