Affiliation:
1. School of Civil Engineering, Central South University, Changsha 410075, China
2. School of Automation, Central South University, Changsha 410083, China
Abstract
The differences in constraints between an automotive painting workshop and a final assembly workshop can lead to production scheduling disruptions, and using the Painted Body Store (PBS) in automotive manufacturing can optimize production scheduling to meet the production requirements of the final assembly workshop. This is achieved by establishing a multi-objective mixed-integer optimization scheduling model for PBS and solving the model using a state transition algorithm based on the greedy strategy; finally, a comparison was made with the classical genetic algorithm. The results show that the optimal objective function is achieved when the body sequence movement iterations for data sets N and R are 34 and 54, respectively. At this point, the highest objective function scores are 23.46 and 49.79, and vehicles entering the PBS scheduling system from the painting-to-assembly line require 31 and 38 sequence adjustments, respectively. Compared with the classical genetic algorithm, the simulation results show that the state transition algorithm based on the greedy strategy is significantly better; it can also perform well in discrete sequence movement operations, demonstrating strong global search capabilities and fast convergence. It provides a new approach for optimizing vehicle scheduling in the automotive painting-to-assembly line.
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Reference25 articles.
1. A gravity-like mechanism for car sequencing problem with multistage sequencing buffer;Yu;Adv. Mater. Res.,2011
2. Chen, Z.M. (2008). Research on Multi-Shop Association Sequencing Based on Sequencing Buffer. [Master’s Thesis, Huazhong University of Science and Technology].
3. Bian, C.S. (2008). Job Shop Scheduling Optimization Method Based on Genetic Algorithm and Its Application. [Master’s Thesis, Shanghai Jiao Tong University].
4. Dynamic scheduling method of production plan in automobile manufacturing workshop;Ren;J. Phys. Conf. Ser.,2021
5. Flexible job shop scheduling optimization method based on niche particle swarm optimization algorithm;Yu;Comput. Integr. Manuf. Syst.,2015
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Scheduling Optimization of Paint-Finish Cache Sequencing Area for Car Manufacturing;Proceedings of the 2024 3rd International Symposium on Control Engineering and Robotics;2024-05-24