Identification of Key Design Phase-Related Risks in DBB Projects in the UAE—Towards Developing a BIM Solution

Author:

Badran Deena1,AlZubaidi Radhi1,Venkatachalam Senthilkumar2

Affiliation:

1. College of Engineering, University of Sharjah, Sharjah P.O. Box 27272, United Arab Emirates

2. Indian Institute of Technology Palakkad, Palakkad 678 623, India

Abstract

Building Information Modelling (BIM) has become a widely used concept in high-rise buildings in the United Arab Emirates (UAE). However, the risks associated with the design phase of multi-story high-rise building projects have, to date, not been addressed by the research studies conducted in the UAE. The results show that “Time Spent in Approval Process” is the main cause of delay, “Complying with the New Regulations and Rules” is the main cause of cost overrun and “Poor Coordination between the Design Disciplines” is the main cause of the quality deficiency. The results also indicate that “Poor Coordination between the Design Disciplines’’ is the only risk that has a high-risk index related to time, cost, and quality. “Change Initiated by the Client” and “Interface by the Client during the Design Process” are ranked among the top five risks which cause delay and cost overrun in UAE high-rise buildings. The paper mapped the root causes of the identified most significant risks against the possible BIM-based solutions. The results show that BIM can effectively mitigate 75% of the root causes of these risks and, further, BIM is also effective in managing the consequences of the root causes for the remaining the remaining 25%.

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Reference49 articles.

1. A review of risk management through BIM and BIM-related technologies;Zou;Saf. Sci.,2017

2. Safety by design: Dialogues between designers and builders using virtual reality;Sacks;Constr. Manag. Econ.,2015

3. Quantification and assessment of safety risk in the design of multistory buildings;Dharmapalan;J. Constr. Eng. Manag.,2015

4. Kamardeen, I. (2010, January 6–8). 8D BIM modelling tool for accident prevention through design. Proceedings of the 26th Annual ARCOM Conference, Association of Researchers in Construction Management, Leeds, UK.

5. Adafin, J., Wilkinson, S., Rotimi, J., and Odeyinka, H. (2016, January 2–4). Evaluating the budgetary reliability of the design stage elemental cost plan in building procurement. Proceedings of the 9th cidbPostgraduate Conference, The River Club, Cape Town, South Africa.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3