The competitiveness of small modular reactors (SMRs) has been planned based on design simplification, short construction time, passive safety systems, and enabling self-financing by ramp-up construction. Due to the global energy challenges, SMRs have received pervasive attention from a wide range of researchers, designers, developers, stakeholders, and customers. Besides the many advantages related to the design of SMRs, there are challenges ahead of these reactors. SMR licensing is one of the most critical challenges in the front deployment of these reactors. This challenge stems from innovations in SMR designs and systems, such as modularity or deployment for desalination, energy storage, hydrogen production, process heat, and district heating. Due to the lack of experimental data and technical knowledge, the licensing challenges for non-water coolant SMRs are more complicated. Nearly all previous generation reactor licenses were based on conservative analysis while the decision-making methods based on best-estimate and realistic approaches have received more attention in recent years. Thus, the method known as the best estimate plus uncertainty (BEPU) approach is selected for licensing in some cases. At this time, using the BEPU approach in licensing for conventional NPPs is a mature technology and ready for industrial application. Nevertheless, because most previous reactors were licensed based on conservative methods, developers and even regulatory bodies resist re-assessments based on the BEPU approach, while using the choice of conventional conservative methods is a type of roll-back for next-generation SMRs. Thus, this work reviews the BEPU approach and clarifies the possibility of using this approach in the licensing process of SMRs. The lack of experimental data and tight coupling of phenomena along with uncertainty quantification are the main challenges ahead of using BEPU in the licensing process of SMRs.

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Reference52 articles.

1. IAEA (1993). Safety Standards Series No. 110, International Atomic Energy Agency.

2. IAEA (2006). IAEA Safety Standards Series No. SF-1, International Atomic Energy Agency.

3. INSAG-22, IAEA, and International Nuclear Safety Group (2008). Nuclear Safety Infrastructure for a National Nuclear Power Programme Supported by the IAEA Fundamental Safety Principles, International Nuclear Safety Group.

4. IAEA (2012). Licensing the First Nuclear Power Plant, INSAG-26, International Atomic Energy Agency.

5. An international comparison of regulatory organizations and licensing procedures for new nuclear power plants;Bredimas;Energy Policy,2008

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3