Research on the Preparation Process of SBS-Modified Asphalt Using Early Shearing Instead of High-Speed Shearing of Modifier

Author:

Wang Yanlei1,Yi Hongyu2,Cui Yong1,Li Shijiang1,Zhou Shengxiong3,Yan Chuanqi3

Affiliation:

1. Shandong Road and Bridge Group Co., Ltd., Jinan 250014, China

2. China Railway Development Investment Group Co., Ltd., Kunming 650200, China

3. Highway Engineering Key Laboratory of Sichuan Province, Civil Engineering School, Southwest Jiaotong University, Chengdu 610031, China

Abstract

To investigate the effect of pre-shredding as a replacement for high-speed shearing in the preparation process of SBS-modified asphalt, the particle size and mixing time of pre-shredded SBS modifier were studied. Laser confocal microscopy was used to observe the morphological changes and dispersion state of the SBS modifier during the mixing process, and process parameters were determined through rheological performance tests. FTIR tests were conducted on the original asphalt and PAV-aged modified asphalt to assess the impact of the pre-shredding process on the chemical composition and aging resistance of the modified asphalt. The specific conclusions were as follows. During the preparation process of the SBS modifier using low-speed mixing, the morphological changes of the SBS modifier can be summarized as follows: It cycles through edge networking, mesh fiberization, and filamentous granulation, and eventually presents a granular atomization form after multiple cycles. It is recommended that the mixing time be maintained between 30 and 60 min, which results in the microstructure of the modified asphalt consisting of filamentous and point-like combinations. This asphalt exhibited excellent performance in high-temperature rut resistance, fatigue resistance, and low-temperature crack resistance. When the mixing time was too long, the SBS modifier formed small granules in an atomized state, which weakened the strength of the mesh structure and led to a decrease in overall performance. It is recommended that the SBS be shredded into particles sized between 18 and 30 mesh or 30 and 100 mesh. SBS-modified asphalt with SBS particles sized between 18 and 30 mesh exhibited greater hardness in the mesh structure, resulting in better high-temperature rut resistance. SBS-modified asphalt with SBS particles sized between 30 and 100 mesh had better extensibility in the mesh structure, leading to superior performance in medium-temperature fatigue resistance and low-temperature crack resistance. Compared to the conventional process, the pre-shredding process for preparing SBS-modified asphalt improved aging resistance by 10% to 13%. Additionally, SBS-modified asphalt prepared using the pre-shredding process saved 1 to 3 h of processing time compared to the traditional preparation method, reducing energy consumption. Furthermore, the asphalt produced through the new process exhibited better performance, reducing road wear and saving maintenance costs.

Funder

National Key R&D program of China

Hong Kong scholars program

National Natural Science Foundation of China

Sichuan Youth Science and Technology Innovation Research Team

Publisher

MDPI AG

Subject

Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3