A Stope Mining Design with Consideration of Hanging Wall When Transitioning from Open Pit Mining to Underground Mining for Sepon Gold Mine Deposit, Laos

Author:

Phaisopha Seelae12,Shimada Hideki1ORCID,Sasaoka Takashi1,Hamanaka Akihiro1ORCID,Pongpanya Phanthoudeth3,Shorin Seva4,Senthavisouk Khounma4

Affiliation:

1. Department of Earth Resources Engineering, Kyushu University, Fukuoka 819-0395, Japan

2. Department of Mining Engineering, Polytechnic College, Vientiane 0100, Laos

3. Department of Mining Engineering, Faculty of Engineering, National University of Laos, Vientiane 0100, Laos

4. Lane Xang Minerals Limited, Vientiane 4486, Laos

Abstract

This study investigates the transition from surface to underground mining at the Sepon Gold mine. The stability of surface slopes is assessed prior to commencing underground operations. Stope mining is adopted based on ore body characteristics and geological features. Finite element numerical analysis, employing the Generalized Hoek–Brown criterion, evaluates slope stability for surface slopes and opening stopes. The pit design comprises a 70° slope angle, 20 m height, and 10–15 m safety berm, meeting stability requirements with a factor of safety of 2.46. Underground mining design includes a 62° ore body dip, a 50 m thick crown pillar to prevent surface subsidence, and 5 m wide, 5 m high stopes. Sill pillars are left for support after each level of excavation. Rock bolts are employed in specific stope areas where necessary, with continuous monitoring for surface deformation. This study analyzes the influence of stope sizes on the pit wall and pit bottom stability, identifying slope failures near the hanging wall close to the pit bottom during underground mining. A slight increase in the displacement zone is observed on the upper crest of the top footwall. Overall, the findings demonstrate successful stability in the transition from surface to underground mining at the Sepon Gold mine.

Funder

JICA

Publisher

MDPI AG

Subject

General Medicine

Reference41 articles.

1. Optimization of open pit to underground transition depth: An idea for reducing waste rock contamination while maximizing economic benefits;Osanloo;J. Clean. Prod.,2020

2. Transition from open-pit to underground as a new optimization challenge in mining engineering;Bakhtavar;J. Min. Sci.,2009

3. Optimization of the transition from open-pit to underground operation in combined mining using (0-1) integer programming;Bakhtavar;J. S. Afr. Inst. Min. Metall.,2012

4. Potvin, Y., and Hudyma, M. (November, January 29). Open Stope Mining in Canada Yves Potvin and Marty Hudyma Australian Centre for Geomechanics. Proceedings of the MassMin, Brisbane, Australia.

5. Timing of transition from open-pit to underground mining: A simultaneous optimisation model for open-pit and underground mine production schedules;Chung;Resour. Policy,2022

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3