Abstract
The pressure drop of a main steam and reheat steam system should be optimized during the design and operation of a thermal power plant to minimize operation costs. In this study, the pressure drop of the main steam pipe and reheat steam pipe of a 1000 MW secondary reheat unit are optimized by modulating the operation parameters and the cost of operation is explored. Optimal pipe specifications were achieved by selecting a bend pipe and optimizing the pipe specifications. The pressure loss of the main steam pipeline was optimized to 2.61% compared with the conventional pressure drop (5%), the heat consumption of steam turbine was reduced by about 0.63 kJ/(kW·h), the standard coal consumption was minimized by about 0.024 g/(kW·h), and the total income in 20 years is approximated to be CNY 217,700. The primary reheat system was optimized to 4.88%, the steam turbine heat consumption was reduced by about 7.13 kJ/(kW·h), the standard coal consumption decreased by about 0.276 g/(kW·h), and the total income in 20 years is projected to be CNY 20.872 million after the optimization of the pressure drop. The secondary reheat system was optimized to 8.13%, the steam turbine heat consumption was reduced by about 7.86 kJ/(kW·h), the standard coal consumption decreased by about 0.304 g/(kW·h), and the total income in 20 years is projected to be CNY 22.7232 million after the optimization of the pressure drop. The research results of the present study provide a guide for the design and operation of secondary reheat units to achieve an effective operation and minimize costs.
Funder
National Key Research and Development Plan
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献