Directional Core Drilling as an Approach to Reduce Uncertainty in Tunneling Construction

Author:

Rodríguez Rafael1,Fernández Valentín2,Bascompta Marc3ORCID,Garcia-Gonzalez Hector4ORCID

Affiliation:

1. Department of Mining Exploitation and Prospecting, School of Mining, University of Oviedo, Energy and Materials Engineering, Independencia 13, 33004 Oviedo, Spain

2. Pedraplus Ingeniería, C/Eduardo de Fraga 6, 33011 Oviedo, Spain

3. Department of Mining, Industrial and ICT Engineering, Polytechnic University of Catalonia (UPC), Av. Bases de Manresa, 61-73, 08242 Manresa, Spain

4. Technical Department, Instituto Nacional de Silicosis, la Minería 1, 33011 Oviedo, Spain

Abstract

The definition of a rock mass’s characteristics is crucial in underground construction to avoid delays and cost overruns. This study proposes a system to quantify the economic uncertainty related to a lack of knowledge of a rock mass in the tunnel construction stage, either for tunnel boring machines or for drill and blast excavation techniques. Using a back-analysis of three actual tunnels completed in Spain (Burata, Lot 3 of the Pajares variant, and Bolaños), the study assessed the directional core drilling technique (DCD) for this purpose, comparing it with conventional boreholes. In this regard, the DCD approach reduced the uncertainty by between EUR 6.7 and EUR 12.7 for every EUR 1, while the total cost of the drilling campaign remained within a widely accepted proportion of the construction budget. Overall, the uncertainty was reduced by approximately EUR 6000 per meter of the tunnel.

Publisher

MDPI AG

Subject

Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science

Reference64 articles.

1. Estefanía, C., Fuldain, J.A., Laguna, J.A., and Arlandi, M. (2010). Payment for Tunnel Construction by Means of the Standard Rate Method: Experience on the Bilbao South Metropolitan By-Pass, Association Canadian Tunnels ACT.

2. Benardos, A., Paraskevopoulou, C., and Diederichs, M. (October, January 29). Assessing and benchmarking the construction cost of tunnels. Proceedings of the 66th Canadian Geotechnical Conference, GeoMontreal on Geoscience for Sustainability, Montréal, QC, Canada.

3. Estimating cost for transportation tunnel projects: A systematic literature review;Membah;Int. J. Constr. Manag.,2015

4. Underground cavern development in the Jurong sedimentary rock formation;Zhao;Tunn. Undergr. Space Technol.,1999

5. Tunnel construction costs for tube transportation systems;Sinfield;J. Constr. Eng. Manag.,1997

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3