Abstract
This paper addresses critical success factors for the delivery of BIM projects. The lack of experience with BIM projects on both the demand and supply side often leads to insufficient project teams, unsatisfied clients, schedule, and cost overruns. In order to better structure and control the information delivery in BIM projects requirements, planning and delivery must be standardized. The latter was achieved by EIR (Exchange Information Requirements), new BIM roles, BEP (BIM Execution Plan), and specified digital handover, which must be supported by a common data environment (CDE). This paper provides an analysis of the characteristics of BIM project delivery and duration in Architectural and Engineering companies in Slovakia. The analysis is based on the web survey of BIM managers and coordinators, which reveals that a significant amount of BIM project efforts must be executed by BIM specialists. The results also graphically depict the scope of critical BIM activities across project phases. The presented study is relevant for various project stakeholders and allows for a deeper understanding of the resources needed for the successful delivery of BIM projects in terms of adequate project team capacity, capability, organization, and planning.
Funder
Slovak Research and Development Agency
Subject
Building and Construction,Civil and Structural Engineering,Architecture
Reference67 articles.
1. STN EN ISO 19650-1 Organization and Digitization of Information about Buildings and Civil Engineering Works, Including Building Information Modelling (BIM). Information Management Using Building Information Modelling. Part 1: Concepts and Principles,2020
2. STN EN ISO 19650-2 Organization and Digitization of Information about Buildings and Civil Engineering Works, Including Building Information Modelling (BIM). Information Management Using Building Information Modelling. Part 2: Delivery Phase of the Assets,2020
3. BIM Asociácia Slovensko Website of BIM Association Slovakiahttps://en.bimas.sk/
4. Analýza Procesu Detekcie Kolízii v Projektovom Cykle vo Vzťahu k Objemu Práce a Pracovných Činností BIM Koordinátora;Funtík;Buildustry,2020
5. Assessment of synchronous interactive devices for BIM project coordination: Prospective ergonomics approach
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献