Affiliation:
1. School of Civil Engineering, Central South University, Changsha 410075, China
2. China Construction 5th Engineering Division Co., Ltd., Changsha 410007, China
3. China Railway Erju 5th Engineering Co., Ltd., Chengdu 610091, China
Abstract
Due to the need for comprehensive transportation hub construction, an existing bridge in a bustling urban area with an operation duration of 25 years was required to be demolished. Based on Life Cycle Assessment (LCA), this paper proposes a scheme of "Self-propelled modular transporter (SPMT) technology + large segment cutting" to compare the carbon emissions of demolition schemes qualitatively and quantitatively. To ensure structural safety during demolition, the finite element analysis was used to simulate the entire demolishing process, and measuring points were set up to monitor the deformation of the main girder in real time under various demolition conditions. The results indicate that the scheme of SPMT has the lowest carbon emissions during the demolition stage. Additionally, the long-term prestress loss shall be considered when demolishing existing bridges; the suggested 25% proportional value for the long-term prestress loss of the Caitian Bridge is appropriate, which is determined by comparing the calculated results from various formulas. The values of the calculated and measured deformations of the main girder under different working conditions are in good agreement, with errors mostly within 10% and a maximum of no more than 14.7%. The demolition of the entire bridge was completed in a total of 28 h with little noise and pollution, and the impact on daily traffic was avoided, proving that the proposed “SPMT technology + large segment cutting” scheme is safe, efficient, and achieves the goal of green, environmentally friendly, and rapid demolition.
Funder
Natural Science Foundation of Hunan Province, China
Subject
Building and Construction,Civil and Structural Engineering,Architecture
Reference31 articles.
1. IEA (2023, April 15). CO2 Emissions in 2022. Available online: https://www.iea.org/reports/co2-emissions-in-2022.
2. Zhou, F., Ning, Y., Guo, X., and Guo, S. (2023). Analyze Differences in Carbon Emissions from Traditional and Prefabricated Buildings Combining the Life Cycle. Buildings, 13.
3. Rymsza, J. (2021). Causes of the Collapse of the Polcevera Viaduct in Genoa, Italy. Appl. Sci., 11.
4. Economic vs environmental isocost and isoperformance curves for the seismic and energy improvement of buildings considering Life Cycle Assessment;Giresini;Eng. Struct.,2021
5. Liu, H., Guo, R., Tian, J., Sun, H., Wang, Y., Li, H., and Yao, L. (2022). Quantifying the Carbon Reduction Potential of Recycling Construction Waste Based on Life Cycle Assessment: A Case of Jiangsu Province. Int. J. Environ. Res. Public Health, 19.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献