A Fully Prefabricated Pile-Wall Composite Scheme of Open-Cut Tunnel and the Mechanical Behavior of the Composite Structure during Construction

Author:

Ma Shaolin12,Li Zhaoping12,Fu Ruian3

Affiliation:

1. Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China

2. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China

3. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, China

Abstract

In open-cut assembled subway tunnels, foundation pit enclosure piles are typically cast in place. However, this conventional approach limits the functionality of the piles to serving as retaining structures during excavation, resulting in resource inefficiency and the underutilization of prefabrication techniques. To address this issue, a fully prefabricated pile-wall composite scheme is proposed for cut-and-cover tunnels to optimize the retaining effect of the piles and leverage the benefits of prefabricated technology. In this scheme, the retaining pile and lining are both prefabricated. The pile is the temporary retaining structure during pit excavation and a part of the sidewall. This scheme was researched and applied in Jinan, China. Field monitoring and numerical simulation were used to investigate the load transfer within the fully prefabricated pile-wall composite structure (PPWS) and its mechanical response, respectively. The results show: (1) The development of lateral earth pressures on the PPWS experienced three stages. The lateral earth pressure distribution indicates that the PPWS can fully activate the retaining effect of precast piles. (2) Following the backfilling of the joints, the horizontal displacement at the bottom of the precast pile reduced by 0.39 mm. Numerical simulation results indicate the effectiveness of precast pile restraint in PPWS. (3) The PPWS exhibited uniform deformation transition at the joints. The joints play a crucial role in coordinating deformation between the precast piles and sidewalls, utilizing the restraining effect of the precast piles.

Funder

National Key Research and Development Program of China

Science and Technology Research and Development Program of China Railway Siyuan Survey and Design Group Co., Ltd.

Publisher

MDPI AG

Reference35 articles.

1. Present status and technology of shield tunneling method in Japan;Koyama;Tunn. Undergr. Space Technol.,2003

2. Influence of non-associated flow rule on passive face instability for shallow shield tunnels;Li;Tunn. Undergr. Space Technol.,2022

3. Development and prospect of construction technology for prefabricated metro station in China;Yang;Tunn. Constr.,2021

4. Research and application of prefabricated structure construction technology for metro station;Yang;Tunn. Constr.,2022

5. Prefabrication technology for underground metro station structure;Yang;Tunn. Undergr. Space Technol.,2021

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3