Affiliation:
1. Department of Civil Engineering, College of Civil Engineering, Architecture and Environment, Hubei University of Technology, Wuhan 430068, China
2. Central-South Architectural Design Institute, Wuhan 430064, China
3. The Third Bureau of China State Construction Engineering Corporation, Wuhan 430061, China
Abstract
(1) This paper, based on the characteristics of complex steel structures as well as difficult points in the process of their detailed design, introduces the product design concept of DfMA (Design for Manufacturing and Assembly) from the manufacturing industry and studies the detailed design method of BIM-FEM model conversion. The BIM software Revit (2020) is used as the basis for the BIM detailed design of the project, which achieves the purpose of rapid modeling and provides a detailed design model basis for finite element analysis. (2) Utilizing the Revit API and C# for secondary development as the technical means, this approach involves converting the geometric entity model described by CSG-Brep into an APDL stream. This creates an interface with the finite element analysis software ANSYS (12.0) to implement the detailed design of BIM-FEM model conversion, optimizing the algorithm for converting complex analysis models that require high precision for special-shaped steel structures. (3) This research addresses issues such as the disconnection between the design, manufacturing, and construction of special-shaped steel structures, providing support for design decisions. Moreover, it enhances the detailed design method by improving the standardization of special-shaped components under the condition of design diversity. (4) These studies provide sustainability for engineering design, manufacturing, and construction projects, enabling the maximization of benefits and product lifecycle management (PLM) through these projects. (5) Finally, a case study analysis was conducted on the Wuhan City New Generation Weather Radar Construction Project, designed by the Central South Architectural Design Institute (CSADI), to verify the detailed design of BIM-FEM model conversion. This proved the scientific validity, practicality, and necessity of this research.
Funder
Department of Science and Technology of Hubei Province
Reference29 articles.
1. The common problems in the construction of irregular building and the management measures of project supervisor;Bo;J. Construct. Economy,2021
2. The application of BIM in detailed design of complex special-shaped buildings;Liu;J. Construct. Econ.,2019
3. Probabilistic analysis of irregular structures with consideration of construction process;Xu;J. Build. Struct.,2011
4. Motivations and limitations of prefabricated building: An overview;Ghazali;J. Appl. Mech. Mater.,2017
5. Research on deepening design and construction of cross-sea tunnel based on the principle of prefabricated building: Earth environ;He;IOP Conf. Ser. Sci.,2020