Abstract
In this paper, we present a simulation-based approach for effectively estimating delay risks in project schedules and predicting the possibilities of in-time project completion for various deadlines. The main contribution of this study is the development of a novel approach for duration risk quantification, which uses a newly introduced equation for total risk estimation regarding activities’ durations, and quantifying the manager’s experience as expressed through a questionnaire. In addition, the proposed approach integrates these preferences into a simulation-based framework used for estimating the activities’ durations variation and predicting the actual project duration with more accuracy. Furthermore, using different distributions according to each activity characteristic supports decision making from a wide range of experts, from risk-averse to risk-seeking managers. The proposed method was applied to estimate the total project completion time of a complicated hotel renovation project and the possibility for the project to be delivered within an imposed deadline. The promising results in comparison to the classic PERT method proved that this process can better express the uncertainty and provide project risk managers with better predictions when estimating budget and time-critical overruns under lack of knowledge and historical data.
Subject
Building and Construction,Civil and Structural Engineering,Architecture
Cited by
35 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献