Off-Site Manufacturing: Determining Decision-Making Factors

Author:

Kosbar Mohamed M.1,Elbeltagi Emad2ORCID,Mahdi Ibrahim3ORCID,Kassem Mahmoud4ORCID,Ehab A.5ORCID

Affiliation:

1. College of Engineering and Technology, Arab Academy for Science, Technology & Maritime Transport (AASTMT), Giza 12577, Egypt

2. Construction Management, Department of Structural Engineering, Mansoura University, Mansoura 35516, Egypt

3. Construction Management, Department of Structural Engineering and Construction Management, Future University in Egypt (FUE), New Cairo 11835, Egypt

4. Department of Construction and Building Engineering, Arab Academy for Science, Technology & Maritime Transport (AASTMT), Cairo 12577, Egypt

5. Civil Engineering Department, Badr University in Cairo (BUC), Badr City 11829, Egypt

Abstract

New technologies like modular construction are expected to increase the market share in developing countries with a high annual growth rate such as in Egypt. Modular construction solutions that have content depending on the process of off-site construction and on-site transportation gained prominence over recent years due to several benefits, especially their positive impact on the environment. Off-site manufacturing (OSM) and traditional technologies like on-site ones differ in many aspects of design, requirements, logistics, engineering, and others. Many researchers studied modular construction and they fall short of investigating modular construction processes comprehensively and completely. In this paper, the barriers and benefits of using off-site manufacturing (OSM) are collected from the previous studies (that focused on mega projects, high quality, and fast-track projects) to be analyzed using a social network analysis (SNA) to promote the implementation of this new technology mainly in high-annual-growth-rate countries. A survey was used to solicit the opinions of construction practitioners to identify the most significant barriers and obstacles, as well as the benefits of using OSM. Also, due to the capabilities of Building Information Modeling (BIM) to manage shared information and increase the cooperation among project parties, the integration of OSM and BIM is investigated as a promising approach to overcome OSM barriers and enhance its utilization. Analyzing the main barriers’ density and finding out the main solution are involved. Applying this case to a real project in Egypt to study the impact of using (OSM) on-site and exporting the data are also involved. With some results related to the other results and disadvantages that were deduced, the most important advantages and most disadvantages emerged, as well as finding ways to solve them and practical application on the ground.

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3