A Multivariate Analysis of the Variables Impacting the Level of BIM Expertise of Professionals in the Architecture, Engineering and Construction (AEC) Industries of the Developing World Using Nonparametric Tests

Author:

Takyi-Annan Georgina Esi1ORCID,Zhang Hong1

Affiliation:

1. School of Architecture, Southeast University, No. 90 Chengxian Street, Xuanwu District, Nanjing 210096, China

Abstract

Building information modeling (BIM) mandates are becoming more widespread because BIM allows design and construction teams to operate more productively and also enables them to collect the data they generate during the process for use in operations and maintenance tasks. As a result, professionals in the architecture, engineering and construction (AEC) industries are expected to possess excellent BIM expertise. Despite the fact that the developing world has largely not adopted BIM, many studies have been conducted on BIM usage, awareness, drivers and barriers with a focus on the developing world. Numerous studies have pointed to the professionals’ lack of BIM expertise in the developing world’s AEC sector as a major barrier to BIM deployment. Nevertheless, no research has been conducted to assess the variables impacting the level of BIM expertise among professionals. After a detailed review of the literature, the study developed five study hypotheses and created a conceptual model to help assess the variables impacting the level of BIM expertise of professionals in the AEC industry in the developing world. After that, a questionnaire survey was carried out to collect data from 103 seasoned professionals in the Ghanaian construction industry. Nonparametric tests, such as the Kruskal–Wallis, pairwise post hoc Dunn, Mann–Whitney, Pearson’s correlation and the partial least squares structural equation modeling (PLS SEM) tests, were adopted to assess the relationships between the level of BIM expertise of professionals (BE) and the following variables: (1) profession (P), (2) the frequency of BIM use by professionals (BF), (3) the highest dimension of BIM adopted by AEC firms and companies (BD), (4) professionals’ perception of BIM (PB) and (5) the BIM implementation barriers (BIMIBs). P, BF, BD and PB were found to have a substantial impact on the level of BIM expertise acquired by professionals. With regards to professionals’ perception of the BIM software and process, only one (PB3–BIM is not useful to our company at the moment) out of ten of them was found to have a significant impact on BE, highlighting the impact of employers on the level of BIM expertise of professionals. In addition, the study discovered that any resolution made in an attempt to tackle the lack of/insufficient level of BIM expertise among professionals would prove futile without significant effort from the higher education sector (HES) of the developing world and the entire world at large. The study’s conceptual, empirical, managerial and theoretical implications and findings would serve as a roadmap for researchers, professionals and academics in developing nations as they endeavor to seek more ways of increasing BIM expertise among their professionals and to encourage BIM usage throughout the project lifecycle.

Funder

Parts and Components Library and Building Information Model Sub-part, Coding and Labeling Standards

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference108 articles.

1. Sethia, S. (2023, April 21). Multidimensional BIM to Build Infrastructure Fast and Efficient—An Overview. Available online: https://www.ijedr.org.

2. British Standards Institution (2010). Constructing the Business Case of Building Information Modelling, Building SMART UK Publishing.

3. Tarar, M., and Dang, D.T.P. (2012). Impact of 4D Modelling on Construction Planning Process, Chalmers University of Technology.

4. Davies, K., McMeel, D., and Wilkinson, S. (2015, January 27–29). Soft skills requirements in a BIM project team. Proceedings of the 32nd CIB W78 Conference 2015, Eindhoven, The Netherlands.

5. Boton, C., Kubicki, S., and Halin, G. (2023, April 21). 4D/BIM Simulation for Pre-Construction and Construction Scheduling. Multiple Levels of Development within a Single Case Study. BIMetric View project Monumentum Project View Project 4D/BIM Simulation for Pre-Construction and Construction Scheduling. Multiple Levels of Development within a Single Case Study. Available online: https://www.researchgate.net/publication/279953595_4DBIM_simulation_for_pre-construction_and_construction_scheduling_Multiple_levels_of_development_within_a_single_case_study?channel=doi&linkId=559f8daf08ae8a0fbedc98e9&showFulltext=true.

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3