Unveiling Economic Synchrony: Analyzing Lag Dynamics between GDP Growth and Construction Activity in Poland and Other EU Countries

Author:

Sobieraj Janusz1ORCID,Metelski Dominik2ORCID

Affiliation:

1. Department of Building Engineering, Warsaw University of Technology, 00-637 Warsaw, Poland

2. Faculty of Economics and Management Sciences, Department of International and Spanish Economics, University of Granada, 18071 Granada, Spain

Abstract

This study examines the dynamic relationship between the business cycle and the construction sector activity in 27 EU countries, focusing on Poland. Using the cross-correlation function (CCF) and a set of economic- and construction-related variables, including GDP growth, construction production, building permits, and construction operating time by backlog, quarterly data from 2000Q1 to 2023Q2 (94 quarters in total) are analyzed. Beyond the CCF analysis, causality is also examined using Toda–Yamamoto tests to explore the nuanced temporal relationships between GDP growth and construction activity proxies. The research uncovers synchronized positive lag max results for construction production, suggesting a harmonized response to broader economic changes, especially within 9 to 11 quarters. In contrast, building permits and construction time by backlog show divergent positive lag max values, suggesting the need for tailored, localized strategies. Negative lag max values emphasize the anticipatory role of the construction sector as an early indicator of economic change. Overcoming methodological challenges, this study provides insights critical for policymakers and researchers, promoting a nuanced understanding of economic synchrony and guiding informed strategies for sustainable development. Future recommendations include refining localized strategies based on lag patterns for optimal economic management.

Publisher

MDPI AG

Reference75 articles.

1. Sloate, P.L. (2023, November 20). The Construction Industry: Focus on Forecasting. Available online: https://www.contractingbusiness.com/hvacrdb/article/20859154/the-construction-industry-focus-on-forecasting.

2. (2023, November 20). BCAnalytics, Construction Cycle. Available online: https://bcanalytics.co.za/services/business-cycle-analysis/sectors/construction-cycle/.

3. Vasilopoulos, K., and Tayler, W. (2018). Real Estate and Construction Sector Dynamics in the Business Cycle, Department of Economics, Lancaster University Management School.

4. Pheng, L.S., and Hou, L.S. (2019). Construction Quality and the Economy, Springer.

5. Time-to-plan lags for commercial construction projects;Millar;Reg. Sci. Urban Econ.,2016

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3