Abstract
Without a building permit, a construction project cannot be legally implemented. For this, the building project must undergo a review process by the competent authority. As the number of building projects to be inspected increases, building authorities are faced with ever greater challenges, due to the lack of adequate personnel to manage the inefficient, labor extensive, and lengthy building permit process. In-depth scientific studies of the existing building permit processes are missing so far. This paper introduces a proposed framework that aims to investigate and compare the building permit processes in Germany and in the United States of America (USA). Among other things, the processes are studied for both by-right and non-by-right cases. In doing so, the data are based on a collected empirical study in the form of qualitative expert interviews. The findings of the comparison provide a detailed description and illustration of the current building permit processes, as well as the lessons learned from both countries.
Subject
Building and Construction,Civil and Structural Engineering,Architecture
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献