Development of a New Method for Assessing Project Risks in Sustainable Building Construction Projects in Developing Countries: The Case of Jordan

Author:

Alawneh Rami1,Jannoud Ismael1ORCID,Rabayah Hesham1ORCID,Asaad Samaher1,Almasaeid Hatem2ORCID,Imam Rana3ORCID,Ghazali Farid Ezanee Mohamed4

Affiliation:

1. Department of Civil and Infrastructure Engineering, Al-Zaytoonah University of Jordan, Amman 11733, Jordan

2. Department of Civil Engineering, Al Al-Bayt University, Al-Mafraq 25113, Jordan

3. Department of Civil Engineering, The University of Jordan, Amman 11942, Jordan

4. School of Civil Engineering, Universiti Sains Malaysia, Nibong Tebal 14300, Malaysia

Abstract

Sustainable buildings contribute significantly to achieving sustainable development and provide many benefits. However, sustainable building construction projects are riskier than traditional construction projects. Thus, this research aimed to identify and assess the risks in sustainable construction projects in Jordan based on their probabilities of occurrence and impacts on time and cost. For this purpose, a literature review and structured interviews were performed to identify the risks. Additionally, questionnaire surveys were conducted, and the relative relevance index and analytic hierarchy process were utilized to assess the probabilities and impacts of these risks on time and cost. After that, a focus group discussion was conducted. According to the the risks’ probability and impacts on time and cost, the top-scoring risks include changes to the original design, budgeting inaccuracies owing to a lack of experience with sustainable building projects, additional costs incurred as a result of the use of sustainable building construction materials and equipment, inadequate or inaccurate sustainable design information, insufficient funds from clients, inadequate project planning for a sustainable building project, a tight project schedule for a sustainable building project, and insufficient identification of sustainable construction’s scope. This research contributes to the body of knowledge and practice by providing a novel integrated method for assessing risks in sustainable building construction projects in Jordan.

Publisher

MDPI AG

Reference64 articles.

1. Project Management Institute (2017). A Guide to the Project Management Body of Knowledge (PMBOK Guide), Project Management Institute. [6th ed.].

2. The project risk management process, a preliminary study;Crispim;Procedia Technol.,2014

3. Latham, M. (1994). Constructing the Team: Joint Review of Procurement and Contractual Agreements in the UK Construction Industry, Department of the Environment.

4. Analysis of the risk impact of internal factors on time in building construction projects in Aceh Province;Ariska;AIP Conf. Proc.,2024

5. A Multi-Criteria Decision Support Model for the Management of Construction Project Risks;Kazaz;J. Constr. Eng. Manag. Innov. (Online),2023

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3