Exploring Risk Factors Affecting Sustainable Outcomes of Global Public–Private Partnership (PPP) Projects: A Stakeholder Perspective

Author:

Li Zilin1,Wang Haotian2

Affiliation:

1. School of Public Administration and Policy, Renmin University of China, Beijing 100872, China

2. The Bartlett Faculty of the Built Environment, University College London, London WC1E 6BT, UK

Abstract

As a model for delivering infrastructure initiatives, public–private partnerships (PPPs) have gained significant popularity in recent years. The globalization of PPP has exposed them to elevated risks emanating from the international real economy and financial market, which can ultimately result in project cancellations or distress. This study analyzes risk factors affecting the sustainable outcomes of global PPP projects from a stakeholder perspective. After identifying the interests of key stakeholders and examining how various risks influence stakeholders’ interests, a two-step binomial probit model is used to investigate domestic and international risk factors in PPP arrangements based on the World Bank PPI database. The empirical results indicate that inflation has a substantially positive effect on project failure, while factors such as PPP experience, central government involvement, exchange rate fluctuations, etc., significantly contribute to PPP success. In addition, the study demonstrates that trade openness and net foreign direct investment (FDI) inflow are crucial for the transmission of global risks. The study also provides policy implications and recommendations from a risk allocation–stakeholder relationship perspective to enhance the resilience of PPP initiatives based on these findings.

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference110 articles.

1. Inderst, G., and Stewart, F. (2014). Institutional Investment in Infrastructure in Emerging Markets and Developing Economies, World Bank Publications.

2. Achieving best value in private finance initiative project procurement;Akintoye;Constr. Manag. Econ.,2003

3. International Bank for Reconstruction and Development/The World Bank (2019). Guidance on PPP Contractual Provisions, International Bank for Reconstruction and Development/The World Bank. [2019th ed.].

4. Performance-based contracting: Are we following the mandate?;Buchanan;J. Public Procure,2007

5. An Agency Theory perspective on the purchase of marketing services;Tate;Ind. Mark. Manag.,2010

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3