Safety Risk Evaluation of Metro Shield Construction When Undercrossing a Bridge
-
Published:2023-10-08
Issue:10
Volume:13
Page:2540
-
ISSN:2075-5309
-
Container-title:Buildings
-
language:en
-
Short-container-title:Buildings
Author:
He Kuang1, Zhu Jun2, Wang Hui3ORCID, Huang Yanlong3ORCID, Li Hujun3ORCID, Dai Zishuang3, Zhang Jingxiao4
Affiliation:
1. Rail Transit Transportation System National Primary Laboratory, Southwest Jiaotong University, Chengdu 610031, China 2. Engineering Fire Technology Center of Henan, Zhengzhou 450052, China 3. Department of Engineering Management, School of Civil Engineering, Henan Polytechnic University, Jiaozuo 454000, China 4. Department of Management Science and Engineering, School of Economics and Management, Chang’an University, Xi’an 710064, China
Abstract
The government of China has planned numerous metro projects, and with more metros, undercrossing of bridges can hardly be avoided. Metro shield construction when undercrossing a bridge (MSCUB) frequently takes place in complicated natural and social contexts, which often makes the construction process more susceptible to safety accidents. Therefore, it is crucial to look into the safety risk during MSCUB. This paper identified the safety risk factors during MSCUB by using a literature review and expert group evaluation, proposed a novel safety risk assessment model by integrating confirmatory factor analysis (CFA) and fuzzy evidence reasoning (FER), and then selected a project case to test the validity of the suggested model. The study results show that (a) a safety risk factor list for MSCUB was identified, including four first-level safety risk factors and thirty-seven second-level safety risk factors; (b) the proposed safety risk assessment model can be used to measure the risk values of the overall safety risk of a worksite, the first-level safety risk factors, and the second-level safety risk factors during MSCUB; (c) environment-type safety risk factors and personnel-type safety risk factors have higher risk values during shield construction when undercrossing a bridge; (d) when compared with worker-type safety risk factors, manager-type safety risk factors are the higher risks. This study can enrich the theoretical knowledge of MSCUB safety risk assessment and provide references for safety managers for conducting scientific and effective safety management on a construction site when constructing metro shields undercrossing a bridge.
Funder
National Natural Science Foundation of China Zhengzhou Metro Group Co., Ltd. Fundamental Research Funds for the Universities of Henan Province The Doctoral fund of Henan Polytechnic University
Subject
Building and Construction,Civil and Structural Engineering,Architecture
Reference73 articles.
1. Cheng, J., Yang, X., Wang, H., Li, H., Lin, X., and Guo, Y. (2022). Evaluation of the Emergency Capability of Subway Shield Construction Based on Cloud Model. Sustainability, 14. 2. A review on blockchain applications in the construction area;Zhang;J. Railw. Sci. Eng.,2023 3. Hu, X., Zhang, X., Dong, L., Li, H., He, Z., and Chen, H. (2022). Carbon Emission Factors Identification and Measurement Model Construction for Railway Construction Projects. Int. J. Environ. Res. Public Health, 19. 4. Chen, H., Li, H., Wang, Y., and Cheng, B. (2020). A comprehensive assessment approach for water-soil environmental risk during railway construction in ecological fragile region based on AHP and MEA. Sustainability, 12. 5. Safety Influential Factors and Accident Causation Model of Subway Shield Construction;Chen;J. Railw. Eng. Soc.,2020
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
|
|