Optimal Cable Force Adjustment for Long-Span Concrete-Filled Steel Tube Arch Bridges: Real-Time Correction and Reliable Results

Author:

Yu Mengsheng1ORCID,Yao Xinyu1ORCID,Deng Nianchun2ORCID,Hao Tianzhi3,Wang Longlin1,Wang Hua1

Affiliation:

1. Guangxi Transportation Science and Technology Group Co., Ltd., Nanning 530007, China

2. College of Civil Engineering and Architecture, Guangxi University, Nanning 530004, China

3. Guangxi Beitou Traffic Maintenance Technology Group Co., Ltd., Nanning 530029, China

Abstract

For complex structures, the existing optimization method for suspender cable forces involves extensive matrix operations during the solution process, requiring high computational power and time. As a result, obtaining a more accurate solution becomes challenging. To address this issue and improve the stress distribution of suspenders in the completed state, while minimizing the need for frequent cable force adjustments and grid beam elevation changes during construction, a novel method for cable force optimization is proposed. In this study, the Pingnan Third Bridge, which is the world’s longest large span arch bridge with a span of 575 m, is taken as the engineering background. This study combines finite element analysis and multi-objective optimization methods to develop a cable force optimization approach for real-time correction during the panel girder lifting of long-span concrete-filled steel tube (CFST) arch bridges. The optimization method involves treating the panel girder weight and displacement during construction as parameter variables, and considering the displacement and unevenness of the panel girder in the completed state as constraint conditions. The objective equation is defined based on the displacement and cable force during the lifting construction process and, through optimization, the cable forces and displacements of each lifting section are calculated. The results demonstrate the feasibility of integrating optimization theory into the cable force optimization process during panel girder lifting. In this study, we have taken into account the characteristics of real-world engineering and focused on specific key points to reduce the order of the influence matrix. Consequently, the computational costs are reduced, facilitating the development of a multi-objective tension optimization program. By minimizing segment displacement variations and ensuring even cable force distribution in the completed state, the method ensures that the bridge meets the required completion requirements without the need for repetitive iterations or cumbersome calculations. It provides higher optimization efficiency and superior outcomes, offering significant value for cable force calculations during suspender construction of similar bridge types and guiding construction processes.

Funder

National Natural Science Foundation of China

Guangxi Natural Science Foundation

Nanning City “Yongjiang Project”

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference39 articles.

1. Zheng, J. (2020). Innovative Technology for 500-Meter Scale CFST Arch Bridge Construction, Shanghai Science and Technology Press.

2. Quality and Risk: Concrete Filled Steel Tubular Arch Bridge;Zheng;China Highw.,2018

3. Chen, B. (2007). CFST Arch Bridge, People’s Communications Press.

4. Development and prospect of long-span arch bridge;Zheng;China Highw.,2017

5. Feasibility Research on Design and Construction of 700 m CFST Arch Bridge;Zheng;China Eng. Sci.,2014

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3