The purpose of this study is to analyze the causes of cost variation in natural disaster prevention projects (NDPPs) in Gyeongsangbuk-do, South Korea, and develop tailored cost and risk management strategies. Utilizing a binary logistic regression model, this research uniquely focuses on the Gyeongsangbuk-do region, gathering data from 244 stakeholders through an online survey. The study identifies critical variables influencing cost deviation, including project management risk (PMR), project costing and execution risk (PCER), project execution strategy risk (PESR), construction project risk (CPR), project cost and schedule risk (PCSR), project management challenges (PMCs), and construction project subcontractor and safety management (CPSSM). Significant findings revealed PMR (OR = 3.744, 95% C.I. [1.657, 8.457]), PCER (OR = 5.068, 95% C.I. [2.236, 11.484]), and PESR (OR = 3.447, 95% C.I. [1.853, 6.413]) as the primary causes of cost deviation, alongside the notable impacts of other factors such as CPSSM. The developed predictive model is instrumental for NDPP stakeholders in Gyeongsangbuk-do, providing advanced risk management capabilities and aiding in effective preventive measures. This study not only corroborates theoretical hypotheses from previous research but also offers new insights into cost deviation causes in NDPPs, thereby enhancing strategic decision-making and advancing risk management perspectives.
Funder
National Research Foundation of Korea
Reference40 articles.
1. Simonds, E.A., Gobenciong, K.A.P., Wilson, J.E., Jiroutek, M.R., Nugent, N.R., and van Tilburg, M.A.L. (2022). Trauma Functioning and Well-Being in Children Who Receive Mental Health Aid after Natural Disaster or War. Children, 9.
2. Development of an Integrated Management System for Disaster Prevention Centered on Living Areas;Kim;Nat. Hazards Earth Syst. Sci.,2022
3. How Common and How Large are Cost Overruns in Transport Infrastructure Projects?;Flyvbjerg;Transp. Rev.,2003
4. Factors Affecting the Accuracy of Construction Project Cost Estimation in Egypt;Ibrahim;Jordan J. Civ. Eng.,2021
5. Causes, Effects and Potential Measures of Cost Deviations in High-Rise Building Projects in Egypt;Raghib;Int. J. Constr. Manag.,2023