Characterization of Mechanical Behavior of Ultra-Small Clearance Tunnel Construction in Upper Soil and Lower Rock Composite Strata

Author:

Zhang Xuemin1,Fu Dong1ORCID,Zhou Xianshun1,Han Yuanyuan2

Affiliation:

1. College of Civil Engineering, Central South University, Changsha 410000, China

2. China Railway No.17 Bureau Group Fifth Engineering Co., Ltd., Taiyuan 030032, China

Abstract

It is hard to grasp the deformation law of the surrounding rock and the force characteristics of the support structure during the construction of ultra-small clearance tunnels in upper soil and lower rock composite strata. Based on the ultra-small clearance tunnel in Li Shuping, Tongxin Expressway, Guizhou, this paper adopted a combination of numerical simulation and field monitoring to analyze the influence of different burial depths and soil-rock interface positions on the deformation of the surrounding rock and the internal forces of the support structure of the ultra-small clearance tunnel. The conclusions are: (1) the monitoring data show that the stress in the steel frame of the leading tunnel increases first by the influence of proximity construction, and then decreases and reaches a stable value after the secondary lining is applied, and the stress at the arch waist of the soft soil layer furtherest from the side of the middle rock column is greater than that in the rock layer on the side of the middle rock column; (2) the position of the soil-rock interface has a significant influence on the initial support force of the first tunnel, and the bending moment of the structure increases with the downward movement of the soil-rock interface and the increase in the burial depth; (3) the influence of the soil-rock interface position on the initial support moment of the first tunnel is greater than the influence of proximity construction, a point to which attention should be paid during construction; and (4) when the soil-rock interface is located below the foot of the arch, the deformation of the surrounding rock of the following tunnel will be larger than that of the first tunnel. The results can provide a reference for the design and construction of ultra-small clearance tunnels in upper soil and lower rock composite soft strata and soil strata.

Funder

National Natural Science Foundation of China

Postgraduate research and innovation project of Central South University

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference35 articles.

1. Lu, A.Z., and Zhang, L.Q. (2007). Complex Function Method on Mechanical Analysis of Underground Tunnel, Science Press.

2. Chen, Z.Y. (1994). Analytical Method of Rock Mechanics Analysis, China Coal Industry Publishing House.

3. Stress analytical solution for an infinite plane containing two tunnels;Lu;Int. J. Mech. Sci.,2017

4. Analytical stress sol ution for an infinite plate containing two oval tunnels;Zeng;Eur. J. Mech.-A/Solids,2018

5. Analytical solutions of stresses and displacements for deeply buried twin tunnels in viscoelastic rock;Wang;Int. J. Rock Mech. Min. Sci.,2017

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3