A New Method for Correcting the Deviation of a Middle Pier Tower of a Long-Span Intermediate Arch Bridge

Author:

Dong Xiaojin1,Ye Dan1

Affiliation:

1. State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, China

Abstract

To control the deviation of a long-span concrete-filled steel tube (CFST) arch bridge during construction monitoring, a practical method for controlling tower deviation is studied and established. The form of construction of this bridge is an intermediate double-arch bridge, which differs from conventional bridges, thus requiring the urgent resolution of the issue of unbalanced middle piers. Therefore, the mechanical characteristics and construction process of an intermediate long-span, dual-coupled steel pipe arch bridge are meticulously examined by using a 1:10 scale model, with particular focus on discussing the deflection of the buckle tower during the installation of the arch rib segments. Construction control is implemented using a novel tower deflection control method that addresses unilateral torsion problems and difficulties in controlling the deflection of the tower. The model results are compared with the finite element analysis output, demonstrating that this new approach can resolve unbalanced tower deviations by maintaining absolute values within 0.5 mm. After correcting these deviations, the measured results from the model bridge tower align with the calculated analytical results and even surpass the theoretical expectations for tower deviation. This remarkable new method accurately resolves real-world bridge tower deviations.

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference32 articles.

1. Structural Study of Arch Bridge With a Span of 600 m Part I: Trial Design;Yazhou;Appl. Mech. Mater.,2011

2. Zhang, F. (2020). Study on Filling Sequence of Long-Span Concrete-Filled Steel Tube Arch Ribs and Hydration Heat of Concrete in Pipes. [Master’s Thesis, Chongqing Jiaotong University].

3. Application and development of concrete-filled steel tube arch bridge;Ma;Eng. Res.,2019

4. Wang, F., Zheng, W., and Liu, H. (2021). Determination and Control of Alignment in Construction of CFST Arch Bridge. Technol. Highw. Transp., 37.

5. Research on Construction Control of Long-span CFST Arch Bridge;Gu;Appl. Mech. Mater.,2015

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3