Additional Stress of Soil and Surface Settlement during Tunnel Shield Construction

Author:

Li Ying1,Bian Xiaowei1,Peng Hao1,Zhu Baoqiang1,Zhou Yilin1

Affiliation:

1. Power China Guiyang Engineering Corporation, Ltd., Guiyang 550081, China

Abstract

To study the influence of shield excavation on the surrounding soil, and to control the influence of the shield excavation of the subway tunnel on the surface settlement and the deformation of the surrounding buildings, it is necessary to study the additional stress of the surrounding soil caused by the tunnel shield excavation and the law of surface settlement. Combined with a shield construction project of a subway tunnel, this article uses the Mindlin solution in elastic mechanics to obtain three-dimensional calculation formulas for the additional thrust on the shield cutter head surface and the additional stress and displacement field caused by the friction force between the shield shell and the soil contact interface on the surrounding soil. The Loganathan ground movement pattern is used to determine the soil movement mode. The source–sink method is used to study the formula for calculating the three-dimensional additional stress of the soil around the shield tunnel caused by ground loss. The results show that when the shield is digging, the ground goes through five stages, namely the uplift of the ground before the arrival of the shield cutter head, surface settlement when the shield reaches the surface subsides when the shield tail of the shield passes through, the passage of the shield tail of the shield, surface settlement when the lining is separated from the shield, and consolidation and settlement after the shield passes through.

Funder

Self-established scientific research projects of enterprises “Research on key technology of full period monitoring in deep buried ultra-long TBM tunnels”

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference28 articles.

1. The Opening Conditions of the Metro and Its Early Characteristics: A Historical Perspective;Chen;Tunn. Undergr. Space Technol.,2021

2. Environmental Pollution and Associated Health Hazards to Host Communities (Case Study: Niger Delta Region of Nigeria);Nichodemus;Cent. Asian J. Environ. Sci. Technol. Innov.,2020

3. Remediation of Damaged Shield Tunnel Using Grouting Technique: Serviceability Improvements and Prevention of Potential Risks;Zhu;J. Perform. Constr. Facil.,2019

4. Study on Influence of Construction Process of Double–Line Shield Tunnels on Frame Structure;Yang;Geotech. Geol. Eng.,2021

5. Surface Settlement Induced by Subway Tunnel Construction Based on Modified Peck Formula;Zhang;Geotech. Geol. Eng.,2019

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3