A Proposed Model for Variation Order Management in Construction Projects

Author:

Ismaeil Esam M. H.12ORCID,Sobaih Abu Elnasr E.34ORCID

Affiliation:

1. Civil and Environmental Department, College of Engineering, King Faisal University, Al-Ahsa 31982, Saudi Arabia

2. Architecture and Urban Planning Department, Faculty of Engineering, Port Said University, Port Said 42526, Egypt

3. Management Department, College of Business Administration, King Faisal University, Al-Ahsa 31982, Saudi Arabia

4. Hotel Management Department, Faculty of Tourism and Hotel Management, Helwan University, Cairo 12612, Egypt

Abstract

This study aims to identify the causes of excessive change orders and their impact on public construction projects in Saudi Arabia. This should support the organizations working in the construction industry to improve variation order management (VOM) as a preventive action by dealing proactively with variation order causes. Therefore, a new methodology was proposed to minimize change orders and their impact on the successful completion of projects as well as cost during the project lifecycle. The methodology involved ten selected turnkey building projects at King Faisal University (KFU) campus, Saudi Arabia. Statistical analyses were conducted to predict the cost overrun in project size and contract value. The findings showed the most significant causes leading to variation order in public construction projects. These include the combined effect of the designer and owner technical committee, designer document, and owner stakeholder committee. Hence, a new model for VOM was developed as a best practice approach, including three stages. The first stage is the initiation process, which includes seven procedures, seven tools, and key responsibilities. The second stage deals with the course of change orders based on a certain number of procedures and weight for each parameter assigned to this phase. It supports decision processes based on a certain average ratio of weights calculation. The third stage is the decision to support decision makers in proceeding or not proceeding with the variation order. Although the present study was conducted in Saudi Arabia’s public building construction project, it is envisaged that these research results are widely applicable to other developing countries. The paper presents a direction for further research to enhance the impact of cost overrun in public sector construction projects in developing countries, i.e., Saudi Arabia.

Funder

Graduate Studies and Scientific Research, King Faisal University, Saudi Arabia

Publisher

MDPI AG

Reference60 articles.

1. (2024, January 10). Construction Extension to the Pmbok® Guide, PMI Institute. Available online: http://faspa.ir/wp-content/uploads/2017/03/faspa.ir-Constrauction.pdf.

2. (2017). AIA Document A201–2017 General Conditions of the Contract for Construction, American Institute of Architects.

3. Effect of change orders on rework in highway projects in Palestine;Mahamid;J. Financ. Manag. Prop. Constr.,2017

4. S, Conflicts: Their types, and their negative and positive effects on organizations;Hussein;Int. J. Sci. Technol. Res.,2019

5. Hughes, W., and Champion, R. (2021). Construction Contracts: Law and Management, Routledge.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3