Public projects continually face multiple difficulties for their satisfactory completion. One of the most complex challenges is early contract termination (ECT), which delays social goods delivery and exhausts public resources. This study aimed to determine the root causes of the critical factors that lead to ECT in public building projects. We studied 20 kindergarten construction projects in Chile through a multi-case study. It addressed a pattern-matching analysis of symptoms associated with risks of design–build (DB) contracts and a five whys analysis to determine the root causes of the symptoms identified in the units of analysis. The results show that ECT projects’ most common symptoms are labor force shortage, materials shortage, and non-payment claims. In addition, the root-cause analysis exposed that the main causes of ECT’s symptoms were deficiencies in the bidding evaluation process, which led to an inadequate selection of the general contractor, lack of experience of the owner, and regulatory limitations of the legal framework for public projects. The construction projects faced ECT and cost and time overruns associated with poor risk management due to the owner’s and general contractor’s lack of experience in DB contracts.
Funder
Pontificia Universidad Católica de Chile
Subject
Building and Construction,Civil and Structural Engineering,Architecture
Reference43 articles.
1. Impact of Risk on Performance of Design and Build Projects in Lagos State, Nigeria
2. Factors for Containing Failure and Abandonment of Public Sector Construction Projects in Nigeria;Amade;J. Build. Perform.,2015
3. TCRP. Documento 41: Evaluation of Project Delivery Methods. Transportation Research Record;Touran,2008
4. Assessing the corporate service quality performance of design-build contractors using quality function deployment
5. Determinants of Successful Design-Build Projects
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献