Study of the Pore Water Pressure Development Characteristics of PHC Pipe Piles in Soft Soil Foundations

Author:

Jia Zhaolin123,Wu Han12ORCID,He Shuaiqi12,Zhao Qixiang12,Zhang Xiaoxu12

Affiliation:

1. School of Water Conservancy and Hydroelectric Power, Hebei University of Engineeing, Handan 056038, China

2. Hebei Key Laboratory of Intelligent Water Conservancy, Hebei University of Engineeing, Handan 056038, China

3. State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China

Abstract

When constructing hollow prestressed high-strength concrete (PHC) pipe piles in soft soil foundations, the generation and dissipation of pore water pressure can induce negative friction on the pile. This phenomenon increases the settlement of the pile foundation and, in severe cases, can lead to pile deflection and flotation. To further investigate the development characteristics of pore water pressure during PHC hollow pipe pile driving in soft soil, this study combined existing theories and numerical models to analyze the generation and influence areas of pore water pressure. Field tests were conducted at three different sites: an untreated site, a surcharge preloading site, and a site treated with cement mixing piles and well dewatering. These tests monitored and analyzed the horizontal and vertical development and behavior of pore water pressure during pile driving at each site. The results indicate that during the pile driving process, when the horizontal distance from the pile center is 3d and 9d, the peak values of the excess pore water pressure in the site treated with cement mixing piles and well dewatering are 117 kPa and 100 kPa. After pile driving is completed, they decrease to 50 kPa and 48 kPa, respectively. The peak values of excess pore water pressure in the surcharge preloading site are 122 kPa and 97 kPa, and after pile driving, they decreased to 80 kPa and 21 kPa, respectively. The peak values of excess pore water pressure in untreated sites are 140 kPa and 121 kPa; after pile driving, they decreased to 82 kPa and 60 kPa, respectively. Pore water pressure increases with the depth of pile driving and decreases with distance from the pile driving location. The peak pore water pressure and dissipation rate during construction were found to be higher at the untreated site compared to the other two sites. Therefore, during pile sinking in soft soil foundations, dewatering and driving drainage boards are effective methods for reducing pore water pressure and accelerating its dissipation. These findings provide a theoretical basis and technical support for ensuring the safety of engineering constructions.

Funder

Open Research Fund of State Key Laboratory of Geomechanics and Geotechnical Engineering, In-stitute of Rock and Soil Mechanics, Chinese Academy of Sciences

Hebei Natural Science Foundation

Publisher

MDPI AG

Reference40 articles.

1. Performance monitoring of offshore PHC pipe pile using BOFDA-based distributed fiber optic sensing system;Zhang;Geomech. Eng.,2021

2. Contrastive experimental analysis of bearing behaviors of PHC pile and precast square piles;Zhang;Rock Soil Mech.,2008

3. PHC pile bearing capacity and application;Su;Adv. Mater. Res.,2013

4. Analysis of engineering characteristics of PHC pipe piles;Xing;Rock Soil Mech.,2009

5. Excavation problems induced by pile driving and their treatment;Jiao;Rock Soil Mech.,2012

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3