1. Feasibility and implications of the modular construction approach for rapid post-disaster recovery;Int. J. Ind. Construct.,2020
2. Smith, K., Woodward, A., Campbell-Lendrum, D., Chadee, D., Honda, Y., Liu, Q., Olwoch, J., Revich, B., Sauerborn, R., and Aranda, C. (2014). Date Human Health: Impacts, Adaptation, and Co-Benefits. Climate Change 2014: Impacts, Adaptation, and Vulnerability Part A: Global and Sectoral Aspects Contribution of Working Group II to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change, Cambridge University Press. Available online: https://www.ipcc.ch/site/assets/uploads/2018/02/WGIIAR5-Chap11_FINAL.pdf.
3. Schwab, J., Topping, K.C., Eadie, C.C., Deyle, R.E., and Smith, R.A. (2022, September 02). Planning for post-disaster recovery and reconstruction: American Planning Association Chicago, IL. Available online: https://www.planning.org/publications/report/9026831/.1884829252.
4. Ghannad, P., Lee, Y.-C., and Choi, J.O. (2019, January 21–24). Investigating Stakeholders’ Perceptions of Feasibility and Implications of Modular Construction-Based Post-Disaster Reconstruction. Proceedings of the Modular and Offsite Construction (MOC) Summit Proceedings, Banff, AB, Canada.
5. Ghannad, P., and Lee, Y.-C. (2020, January 8–10). Prioritization of Post-Disaster Reconstruction of Transportation Network Using an Integrated AHP and Genetic Algorithm. Proceedings of the Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts, Held, AZ, USA.