Affiliation:
1. Department of Electromechanical Engineering, University of Beira Interior, Rua Marquês de D’Ávila e Bolama, 6201-001 Covilhã, Portugal
2. C-MAST-Center for Mechanical and Aerospace Science and Technologies, Rua Marquês de D’Ávila e Bolama, 6201-001 Covilhã, Portugal
Abstract
The business world is becoming more competitive. Therefore, it is crucial to increase the flexibility of production by decreasing the time used in the processes of preparing the production lines for new items’ production, reducing changeover and setup times. This paper presents a case study where the main goal is to reduce the setup time of welding robots. Single Minute Exchange of Die (SMED) was implemented, using other tools such as the Spaghetti Diagram, ERCS Analysis (Eliminate, Rearrange, Combine, Simplify), Gemba Walk, Standardized Work, Flowcharts, and Pareto Diagram. The setup time decreased by 36% in the welding robots studied, decreasing the motions by 43% during the changeover process and reducing the time from the categories: “transportation”, “main”, “other”, and “waiting”. In addition to SMED implementation, this study offers an integrated study of several Lean tools and Quality tools to achieve the maximum reduction of changeover and setup times.
Subject
General Earth and Planetary Sciences
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献