1. Honoré-Livermore, E. (2022). Integrating Agile Systems Engineering and Project Management in Small Satellites Development. [Ph.D Thesis, Norwegian University of Science and Technology].
2. Critical Success Factors for Projects in the Space Sector;Tsiga;J. Mod. Proj. Manag.,2016
3. Liebowitz, J. (2016). REAL Knowledge and the James Webb Space Telescope: Success and Failure Coexisting in NASA. Successes and Failures of Knowledge Management, Morgan Kaufmann.
4. Development of a Knowledge Management System for the NOMAD Instrument Onboard the ExoMars TGO Spacecraft;Hetey;Aircr. Eng. Aerosp. Technol.,2020
5. Basha, N.S., Kwasa, B.J., and Bloebaum, C. (2018, January 17–20). Study of Cost Overrun and Delays of Department of Defense (DoD)’s Space Acquisition Program. Proceedings of the 39th International Annual Conference of the American Society for Engineering Management, Coeur d’Alene, ID, USA.